What services does the company provide?
Our five service areas are chemical anchors/rebar, PU/membrane waterproofing, fire stop, carbon fiber (CFRP), and PU/epoxy crack injection. Methods are selected according to the requirements and conditions of the work.
General consultation
Do you serve locations outside Bekasi?
Our service area covers Indonesia. The location, access, work requirements and proposed timing are discussed during consultation.
General consultation
How do I start a consultation?
Contact us through the official WhatsApp number or email address. The consultation form helps you prepare the project information before sending it yourself.
General consultation
Can a site visit be arranged?
The need for a site visit and its arrangements are discussed during consultation. Timing, scope and any applicable terms must be agreed; we do not state that every visit is free or automatically available.
General consultation
How is a quotation prepared?
Please provide the type of work, location, condition and available technical information. Any further information and the proposed scope are discussed before a quotation can be prepared.
General consultation
Are the same materials used on every project?
No. System and material selection depends on the substrate, use of the area, site conditions, specification and product instructions. The use of a particular brand must be confirmed for the work concerned.
General consultation
When can work begin?
Timing needs to be discussed in relation to the scope, site readiness, access and agreed arrangements. This website does not promise a response time or work schedule that has not been confirmed.
General consultation
What information helps with an anchor enquiry?
Please share the location, intended connection, available drawings and information about the concrete. Capacity calculations and design approval remain subject to the project designer.
Chemical Anchor / Rebar
Are chemical anchors and rebar connections the same?
Both may use a chemical bonding material, but their purpose, connection details and design requirements differ. Suitability needs to be assessed for the work concerned.
Chemical Anchor / Rebar
Can every leak be addressed by applying a coating?
Not necessarily. The water source, cracks, joints and building details need to be considered. Different areas may require different approaches.
PU / Membrane Waterproofing
Does the surface need preparation?
Yes. Cleanliness, strength, moisture and surface profile must be compatible with the material and application method.
PU / Membrane Waterproofing
Can one firestop product be used for every penetration?
No. The separating construction, penetrating service, gap dimensions and system details must be checked first.
Fire Stop
Is a particular fire resistance rating offered?
A rating must refer to the documentation for the applicable system and configuration. We do not state a universal rating without a technical basis for the work concerned.
Fire Stop
Can CFRP be installed without a structural assessment?
The strengthening requirement and design must be determined through an appropriate engineering assessment. Installation does not replace structural calculations.
Carbon Fiber (CFRP)
What should we discuss first?
The function and visible condition of the element, the strengthening objective, available drawings and any existing assessment or design.
Carbon Fiber (CFRP)
What is the main difference between PU and epoxy injection?
PU is primarily considered for suitable water-seepage applications; epoxy is considered for crack filling under specific conditions. The choice depends on the condition and repair objective.
PU / Crack Injection (Epoxy)
Is a photograph enough to decide on the method?
Photos help with the initial discussion. Additional information or an assessment on site may be needed before a scope and method can be agreed.
PU / Crack Injection (Epoxy)