Seepage & concrete cracks

PU / CRACK INJECTION (EPOXY)

Injection applications for water seepage and concrete cracks, with the material and method selected for the conditions of the work.

Discuss This Work
A skilled construction worker in protective gear hammering a rooftop panel. Stock illustration, not a company project.
Stock photo for illustration, not the company’s team or project.

PU injection: addressing water seepage

PU materials may be used to address flowing water or seepage where conditions are suitable. Material selection and injection details depend on the gap, the source of water and the product’s technical instructions.

Epoxy crack injection: addressing concrete cracks

Epoxy may be suitable for filling certain concrete cracks, depending on the repair objective and conditions. Moisture, movement and structural requirements must be assessed. PU and epoxy are not interchangeable solutions for every situation.

General work stages and preparation

An outline to prepare the discussion. The actual sequence and methods depend on site conditions, the scope and technical documents.

  1. Record the crack/seepage location, approximate length and when the problem occurs.
  2. Review the water source, crack movement and repair objective before choosing a material.
  3. Preparation, application and inspection follow the assessment and relevant system instructions.

Typical applications

  • Water seepage through gaps or cracks suitable for PU injection.
  • Filling concrete cracks with epoxy where conditions permit.
  • Repair work based on an assessment of the conditions and an agreed scope.

Factors in choosing a method

  • Identify the water source and whether the crack is active or stable.
  • Check access, substrate condition and material compatibility.
  • Repairs intended to serve a structural purpose require assessment and approval by the project engineer.
Smiling construction worker wearing a helmet at a site in Kitgum Matidi, Uganda. Stock illustration, not a company project.
Stock photo for illustration, not the company’s team or project.

This is a general overview of the service, not a substitute for technical assessment or design. Methods, materials and scope must suit the conditions and requirements of the project.

Consultation and ordering process.

You do not need to choose a material immediately. Start with the conditions and work you would like to discuss.

  1. 01

    Describe the work

    Tell us about the type of work, location, initial conditions and any drawings or photos available.

  2. 02

    Review conditions and requirements

    Review technical information and any further assessment required. A site visit can be discussed where needed.

  3. 03

    Define the scope and quotation

    Discuss methods, preparation, scope and proposed timing before a quotation and agreement.

  4. 04

    Proceed with the work

    Work follows the agreed scope and the technical instructions for the selected system.

BEFORE YOU GET STARTED

Questions about this service.

What is the main difference between PU and epoxy injection?

PU is primarily considered for suitable water-seepage applications; epoxy is considered for crack filling under specific conditions. The choice depends on the condition and repair objective.

Is a photograph enough to decide on the method?

Photos help with the initial discussion. Additional information or an assessment on site may be needed before a scope and method can be agreed.

Two construction workers wearing helmets at a site in India with a crane and building. Stock illustration, not a company project.

START WITH YOUR REQUIREMENTS

Let’s Discuss Your Project Requirements.

Prepare initial project information using the form or contact the company’s official WhatsApp.