FIVE APPLICATION AREAS

Application services for your construction needs.

Five service areas covering concrete connections, protection, strengthening and repairs. Methods and materials are selected according to the conditions and requirements of the work.

START WITH THE BUILDING CONDITIONS

Find a relevant service.

Choose a requirement to see services you can discuss with our team.

This initial guide is not a technical diagnosis or a substitute for a site visit, assessment and engineering design.

View All Services

Service comparison guide

Understand each work objective. Services with different purposes are not automatically interchangeable; method selection requires technical assessment.

Surface waterproofing and seepage injection

PU / Membrane Waterproofing

Main objective
Waterproofing applications for leaks and seepage, with the system selected to suit the building and its condition.
Potentially relevant requirements
Roofs and concrete decks where the selected system is suitable.
Initial information
Record the seepage location, area use and approximate size; prepare photos if available.
Assessment and technical limits
Identify the water source and assess the substrate first. Consider corners, joints, penetrations, drainage and protection of the waterproofing layer. Preparation, thickness, curing and inspection must follow the system specification.

PU Injection

Main objective
Addressing certain seepage paths, subject to assessment of the water source and gap characteristics.
Potentially relevant requirements
PU materials may be used to address flowing water or seepage where conditions are suitable. Material selection and injection details depend on the gap, the source of water and the product’s technical instructions.
Initial information
Record the crack/seepage location, approximate length and when the problem occurs.
Assessment and technical limits
Identify the water source and whether the crack is active or stable. Check access, substrate condition and material compatibility. Repairs intended to serve a structural purpose require assessment and approval by the project engineer.
Chemical anchors and rebar: connection purposes

Chemical Anchors

Main objective
Fixing anchors into concrete for the connection purpose and design details.
Potentially relevant requirements
Anchors for fixtures, supports and connections to concrete.
Initial information
Prepare the connection purpose, approximate fixing count, available drawings and concrete information.
Assessment and technical limits
Check concrete condition, existing reinforcement and access for drilling. Anchor diameter, embedment, spacing and capacity must follow the project design. Hole preparation, installation and curing must follow the material instructions.

Rebar Installation

Main objective
Adding reinforcement for concrete connections according to the designer’s details.
Potentially relevant requirements
Anchors for fixtures, supports and connections to concrete.
Initial information
Prepare the connection purpose, approximate fixing count, available drawings and concrete information.
Assessment and technical limits
Check concrete condition, existing reinforcement and access for drilling. Anchor diameter, embedment, spacing and capacity must follow the project design. Hole preparation, installation and curing must follow the material instructions.
PU and epoxy injection: repair objectives

PU Injection

Main objective
Addressing certain seepage paths, subject to assessment of the water source and gap characteristics.
Potentially relevant requirements
PU materials may be used to address flowing water or seepage where conditions are suitable. Material selection and injection details depend on the gap, the source of water and the product’s technical instructions.
Initial information
Record the crack/seepage location, approximate length and when the problem occurs.
Assessment and technical limits
Identify the water source and whether the crack is active or stable. Check access, substrate condition and material compatibility. Repairs intended to serve a structural purpose require assessment and approval by the project engineer.

Epoxy Injection

Main objective
Filling certain concrete cracks for the repair objective; not a substitute for structural assessment.
Potentially relevant requirements
Epoxy may be suitable for filling certain concrete cracks, depending on the repair objective and conditions. Moisture, movement and structural requirements must be assessed. PU and epoxy are not interchangeable solutions for every situation.
Initial information
Record the crack/seepage location, approximate length and when the problem occurs.
Assessment and technical limits
Identify the water source and whether the crack is active or stable. Check access, substrate condition and material compatibility. Repairs intended to serve a structural purpose require assessment and approval by the project engineer.
CFRP and crack injection: different objectives

Carbon Fiber (CFRP)

Main objective
Carbon fiber applications for concrete strengthening, based on the condition of the structure and an appropriate engineering design.
Potentially relevant requirements
Concrete columns where supported by an assessment and strengthening design.
Initial information
Prepare the element location, strengthening objective and available structural drawings or assessments.
Assessment and technical limits
Structural assessment and a strengthening design are required from the responsible engineer. Assess the substrate and check surface preparation and application details. Fiber type, orientation, layers and protection must follow the design.

Epoxy Injection

Main objective
Filling certain concrete cracks for the repair objective; not a substitute for structural assessment.
Potentially relevant requirements
Epoxy may be suitable for filling certain concrete cracks, depending on the repair objective and conditions. Moisture, movement and structural requirements must be assessed. PU and epoxy are not interchangeable solutions for every situation.
Initial information
Record the crack/seepage location, approximate length and when the problem occurs.
Assessment and technical limits
Identify the water source and whether the crack is active or stable. Check access, substrate condition and material compatibility. Repairs intended to serve a structural purpose require assessment and approval by the project engineer.
Fire stopping at service penetrations

Fire Stop

Main objective
Sealing of service penetrations and gaps using firestop systems that meet the relevant technical requirements.
Potentially relevant requirements
Cable penetrations through separating walls or floors.
Initial information
Prepare the barrier type, pipe/cable type, opening dimensions and project requirements.
Assessment and technical limits
Identify the substrate, opening dimensions and type of service penetration. Match the installation to the relevant system details and technical documentation. A fire resistance rating cannot be established from the name of a single material.

Consultation and ordering process.

You do not need to choose a material immediately. Start with the conditions and work you would like to discuss.

  1. 01

    Describe the work

    Tell us about the type of work, location, initial conditions and any drawings or photos available.

  2. 02

    Review conditions and requirements

    Review technical information and any further assessment required. A site visit can be discussed where needed.

  3. 03

    Define the scope and quotation

    Discuss methods, preparation, scope and proposed timing before a quotation and agreement.

  4. 04

    Proceed with the work

    Work follows the agreed scope and the technical instructions for the selected system.

Two construction workers wearing helmets at a site in India with a crane and building. Stock illustration, not a company project.

START WITH YOUR REQUIREMENTS

Let’s Discuss Your Project Requirements.

Prepare initial project information using the form or contact the company’s official WhatsApp.