Penetration sealing

FIRE STOP

Sealing of service penetrations and gaps using firestop systems that meet the relevant technical requirements.

Discuss This Work
Man in safety gear holding blueprint on construction site with cranes. Stock illustration, not a company project.
Stock photo for illustration, not the company’s team or project.

Match the system to the penetration

Firestopping involves more than filling an opening. The material arrangement and installation must match the selected system. Any rating claim requires relevant tested-system documentation for the particular configuration.

General work stages and preparation

An outline to prepare the discussion. The actual sequence and methods depend on site conditions, the scope and technical documents.

  1. Prepare the barrier type, pipe/cable type, opening dimensions and project requirements.
  2. Match the penetration conditions to relevant system documentation.
  3. Installation and inspection follow the specified system details; a fire rating is not assumed.

Typical applications

  • Cable penetrations through separating walls or floors.
  • Pipe penetrations with a system suitable for the pipe and construction.
  • Gaps and joints included in the specified firestop details.

Factors in choosing a method

  • Identify the substrate, opening dimensions and type of service penetration.
  • Match the installation to the relevant system details and technical documentation.
  • A fire resistance rating cannot be established from the name of a single material.

This is a general overview of the service, not a substitute for technical assessment or design. Methods, materials and scope must suit the conditions and requirements of the project.

Consultation and ordering process.

You do not need to choose a material immediately. Start with the conditions and work you would like to discuss.

  1. 01

    Describe the work

    Tell us about the type of work, location, initial conditions and any drawings or photos available.

  2. 02

    Review conditions and requirements

    Review technical information and any further assessment required. A site visit can be discussed where needed.

  3. 03

    Define the scope and quotation

    Discuss methods, preparation, scope and proposed timing before a quotation and agreement.

  4. 04

    Proceed with the work

    Work follows the agreed scope and the technical instructions for the selected system.

BEFORE YOU GET STARTED

Questions about this service.

Can one firestop product be used for every penetration?

No. The separating construction, penetrating service, gap dimensions and system details must be checked first.

Is a particular fire resistance rating offered?

A rating must refer to the documentation for the applicable system and configuration. We do not state a universal rating without a technical basis for the work concerned.

Two construction workers wearing helmets at a site in India with a crane and building. Stock illustration, not a company project.

START WITH YOUR REQUIREMENTS

Let’s Discuss Your Project Requirements.

Prepare initial project information using the form or contact the company’s official WhatsApp.